Project: Barn conversion and farm house refurbish
- Site clearance to formation level
- Strip footings and underpinning
- Brick and blockwork to dpc
- Reinforce concrete oversites
- Storm and foul drainage
- Services and utility ducts
- Landscaping and drives
|
|
|
|
|
Project: Oak framed cottage with basement
- Site clearance to formation levels
- Raft and strip footing foundations
- Install water proof membranes
- Brick and block work to dpc
- Block and beam floors
- Storm and foul drains
- Service and utility ducts
- Install sewage treatment plant
|
|
|
|
|
Project: Oak Framed extension and steps
- Clear site formation levels
- Strip footings
- Brick and blockwork to dpc
- Storm drains and soakaways
- Concrete oversite
- New patio area with tegular paving and steps
- Frame supplied and fitted by Seven Oak Timber Frames
|
|
|
|
|
Project: Hard landscaping
- Construction of 6002 pool
- Hardwood decking supplied and fitted by Severn Oak Timber Frames
- 8002 of cut and fill to create new levels
- Install sewage treatment plant for future barn conversions
- Service ducts for decorative lighting
- Water services for irrigation
- 120m2 of reclaimed Yorkshire stone paving to create patios and steps
- 180m2 of new granite setts for meandering paths
- 480 tons of topsoil to finish levels
- Soft landscaping by others
|
|
|
|
|
Project: Two houses with basements
- Site clearance to formation level
- Raft and strip footings foundations
- Install waterproofing membranes
- Foul/Storm drains and connect to main sewers
- Service and utility ducts
- Block and beam flooring
- Drives, parking and patios
- Landscaping and fencing
|
|
|
|
|
Project: Three town houses and 11 flats
- Raft and strip footings foundations
- Foul/Storm drains and connect to main sewers
- Block and beam flooring
- Service and utility ducts
- Slabbing kerbs and block paving (see parking areas)
- Form new access to car parks
|
|
|
|
|
Project: Three story town house
- Site clearance to formation level
- Raft foundations
- Foul/storm drains and connect to main sewers
- Service and utility ducts
|
|
|
|
|
Project: Retaining wall
- Set out and install reinforced foundation
with starter bars
- 120m2 block/brick work
- 7m3 cavity fill with mesh
|
|
|
|
|
Project: Oak framed garage with utility room
- Clear site to formation levels
- Strip footings foundation
- Foul drains to septic tank
- Service and utility ducts
- Concrete oversite
|
|
|
|
|
Andrew Donald Groundworks, 33 Pemberton Road, Admaston, Telford, Shropshire, TF5 0BB, UK, UK