Project: Communal drive and services
- Install 180m of 6" and 4" foul drains
- Install 240m of gas, water, electric and BT services
- Set out and reduce dig 7002 to formation levels
- Lay 420m of granite sett edgings
- Grade 700m2 of type 3 stone
- Lay gravel stabilization system with chippings to finish
- 36m2 granite sett demarcation
|
|
|
|
|
Project: Parking areas for barn conversions
- Set out and dig to formation levels
- Lay path edgings and acco drains
- Lay 250m2 tegular paving
|
|
|
|
|
Project: Drives for five new town houses
- Set out and dig to formation level
- Lay path edgings, kerbs and acco drains
- Lay 380m2 block paving
|
|
|
|
|
Project: Two car parks for 11 flats and 3 town houses
- Set out and reduce dig to formation levels
- Lay path edgings, kerbs and acco drains
- Lay slabs and install light bollards
- Lay 370m2 block paving
- Drop kerbs to form new access to car parks
|
|
|
|
|
Project: Parking area for new garage
- Set out and dig to formation levels
- Lay key kerbs and acco drains
- Lay 140m2 tegular paving
|
|
|
|
|